Get a quote
Wide oak floor in a living room and entrance meeting oak stair treads with white risers and dark balusters

About MRG Renovations in Vaughan

This Vaughan flooring site is operated by MRG Renovations Ltd., a general contractor working across the Greater Toronto Area.

Wood floors, stairs and tile in Vaughan

This site separates new flooring from work on wood that can remain in the home.

A worn finish may call for sanding, while loose parquet blocks need repair before the finish coats.

Herringbone changes the layout and the amount of wood compared with straight boards.

For a Maple house with an upstairs landing, include the stair nosing when describing a new floor.

For a VMC unit, the building flooring requirements belong alongside the product choice.

Heated tile adds a heating system and electrical work beneath the finished surface.

The delivery route matters for boxes of wood and bags of preparation material.

We write down which preparation, removal and trim work is included before the flooring job is agreed.

Flooring within general contracting

MRG does flooring, bathroom renovations, kitchens, basement finishing and interior work.

This site is about flooring in Vaughan, including new boards, tile and repairs to wood floors that can stay.

A flooring request can include baseboards, quarter round, door casing, drywall repairs and painting when those pieces belong in the same job.

The written job list shows the floor installation and any work agreed around it.

The work covered here

New floors
Vinyl plank, solid and engineered hardwood, herringbone, porcelain, ceramic and natural stone floor tile.
Wood floors to keep
Sanding and refinishing, parquet repair and sealing, and hardwood stair finishing.
Under the tile
Floor preparation and electric cable or mat heating, with the electrical connection handled separately by an electrician.
Around the edges
Transitions, baseboards and stair nosings, with removal and waste handling agreed for the job.

A quote for your rooms

The area is only one part of a flooring quote.

What comes out, what is underneath and how the new floor meets the next room all affect the work.

Tell us whether the house or condo will be occupied and which rooms need to stay usable.

If the job is part of a larger renovation, include that in the request so the flooring can be planned with the other work.

How a flooring job is planned

Questions about this service

Does this flooring site cover repairs as well as replacement?

This site separates new flooring from work on wood that can remain in the home.

A worn finish may call for sanding, while loose parquet blocks need repair before the finish coats.

Herringbone changes the layout and the amount of wood compared with straight boards.

What differs between stair, condo and heated-tile work?

For a Maple house with an upstairs landing, include the stair nosing when describing a new floor.

For a VMC unit, the building flooring requirements belong alongside the product choice.

Heated tile adds a heating system and electrical work beneath the finished surface.

What is agreed before a Vaughan flooring job?

The delivery route matters for boxes of wood and bags of preparation material.

We write down which preparation, removal and trim work is included before the flooring job is agreed.

Send your Vaughan flooring request

Name the rooms, the existing floor and the material you want.

Get a quote
Get a quoteCall